San Mateo County Office Building 3

County of San Mateo Office Building 3 is a 208,000-square-foot, five-story government office building in downtown Redwood City designed to accommodate approximately 500 County employees. The facility is constructed with cross-laminated timber, making the mass-timber structure a defining element of both the building’s architecture and sustainability strategy. Designed around aggressive energy-performance goals, the project achieved LEED Platinum certification and incorporates operable windows that allow the building to pre-cool naturally during summer conditions, reducing mechanical loads. The project was also recognized by ENR as the 2024 Best Government/Public Building Project.

CMI delivered mechanical systems designed around energy efficiency, occupant comfort, and long-term lifecycle performance. Air-source heat-recovery units provide both chilled and heating water, while variable primary-only pumping systems distribute water to air-handling units, perimeter fan coils, and VAV terminal units throughout the building. A two-pipe perimeter system provides heating or cooling for envelope loads while the central air-handling systems address interior cooling requirements. Because much of the building infrastructure remains exposed within the mass-timber structure, CMI worked closely with the architect and other trade partners to carefully coordinate overhead utilities so the mechanical systems integrate cleanly with the finished architecture.

City:

Redwood City, CA

Project Type:

Public Infrastructure

Project Size:

208,000 SF

General Contractor:

Truebeck Construction

Design-Build:

No

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.